Exterior infrastructure: Construction of the south wall was completed, and the concrete columns of the perimeter wall were poured (0:07-0:11).

Work on villas:
Excavation of villa 6 was carried out
The foundation slabs for villas 4 and 5 were prepared.
The foundation slab for villa 1 was poured.
Construction of the block wall in villa 1 began.